Since the testing and implementation of the CSM load balancer module, we have preparing to migrate the webmail servers behind the load balancer. This entailed getting IP addresses on the CSM server vlan for the webmail servers, and one IP address on the CSM client vlan. Configuring the serverfarm for the webmail servers on the CSM, and changing the webmail DNS name to the client vlan IP.
I also generated a report on the servers that I am the primary caretaker for and their current monitoring status. This is the first step in a process to ensure all of our services are being monitored
In the Virtual Infrastructure, arrangements had been made to migrate 5 law virtual machines and 23 owen virtual machines to be hosted in our virtual infrastructure. This took careful preparation from network configurations to allocated storage. We successfully migrated all virtual machines in question in less a month.
I also began assiting with the web server migration project. I was responsible for copying sites from the old environment to the new environment, testing and working with users to get full functionality of their websites.
The NDE server that serves core network topology information to both the Network Desidn team as well as the general community, had a head crash on a hard drive. In order to bring the system up to current ITS standards, we decided that the Applications Hosting group would take over the maintenance of the physical hardware and the operating system for the Network Design team. We rebuilt this server on a virtual machine in our virtual infrastructure