Activity Report September 2009
25 09 2009Exchange 2007:
The DR storage array a Clariion CX4-240 was configured and brought online this month. The storage groups have all been configured and the dedicated SAN switches have been configured as well. All that is left is for the Exchange host to be brought online and connected to the dedicated SAN switches.
An additional expansion of 6 DAE of storage to the Array dedicated to Exchange is scheduled for a week from this coming Sunday.
E-mail Archive:
We have spent a lot of time around the SOW provided by Symantec and have ironed out the process required for our implementation.
We have installed one archive server and we have a couple of admins using it for their mail.
Projects:
VUspace replacement projects are being ramped up for replacement of the groups and user services. The groups service will be migrated to NAS storage.